
|
Free Proposal
|
If you would like us to send you a FREE proposal, please click here to fill out our proposal request form.
|
- Summary of the association’s number of units, physical description and Reserve Fund financial condition.
- A projection of Reserve Starting Balance, recommended Reserve contributions, projected Reserve expenses, and projected ending Reserve Balance for a minimum of 20 years.
- A tabular listing of the Component Inventory, component quantity or identifying descriptions, Useful Life, Remaining Life, and Current Replacement Cost.
- A description of methods and objectives utilized in computing the Fund Status and development of the Funding Plan(s).
- Sources utilized to obtain component Repair or Replacement cost estimates.
- A description of the Level of Service by which the Reserve Study was prepared.
- Fiscal year for which the Reserve Study is prepared
Levels of Service
Update, With-Site-Visit/On-Site Review: A Reserve Study in which the following six Reserve Study tasks are performed:
- Component Inventory (verification only, not quantification)
- Condition Assessment (based upon on-site visual observations)
- Life and Valuation Estimates
- Fund Status
- Funding Plan(s)
- Disclosure Summary Form (CA only)
Update, No-Site-Visit/Off Site Review: A Reserve Study in which the following four Reserve Study tasks are performed:
- Life and Valuation Estimates
- Fund Status
- Funding Plan
- Funding Plan(s)
- Disclosure Summary Form (CA only)
|
|
|

|
|
|